Skip to main content

graph

 Subject
Subject Source: Local sources

Found in 5 Collections and/or Records:

 Item

Graph 1. Duplicate of 9b, 1940-02-23

 Item
Reference Code: GBR/0273/WHITTLE 11b
Scope and Contents From the File: Proposed reply to Lancelot Law Whyte's enquiry at the meeting on 21 Feb. as to the possibility of BT-H's manufacturing 8 trial W2 engines: if an order were placed on 1 March, and Power Jets supply a complete set of layout drawings of all details and assemblies, and no changes whatsoever are made, BT-H could issue the drawings for the limiting material in 6 weeks from date and complete the final drawings in 12 weeks from date; they could then complete 8 engines by the end of 1940 provided...
Dates: 1940-02-23
 Item

Graph 2. Duplicate of 9c, 1940-02-23

 Item
Reference Code: GBR/0273/WHITTLE 11c
Scope and Contents From the File: Proposed reply to Lancelot Law Whyte's enquiry at the meeting on 21 Feb. as to the possibility of BT-H's manufacturing 8 trial W2 engines: if an order were placed on 1 March, and Power Jets supply a complete set of layout drawings of all details and assemblies, and no changes whatsoever are made, BT-H could issue the drawings for the limiting material in 6 weeks from date and complete the final drawings in 12 weeks from date; they could then complete 8 engines by the end of 1940 provided...
Dates: 1940-02-23