Skip to main content

Depositing concrete in bags on the sea berm March 1884, 1884-03

 Item
Reference Code: GBR/0115/RCS/Y303C/10

Scope and Contents

258 x 208 mm. View looking seawards along the breakwater and showing the ‘Titan’ crane lowering concrete onto the berm beside the breakwater. An apron 24 feet wide composed of 10 bags of concrete was constructed to protect the top of the sea berm from disturbance. This work was completed between 11th February and 2nd April 1884, during which time 712 bags were deposited. The ‘Titan’ was a huge gantry crane which moved along two sets of track set into the breakwater. It was capable of carrying a load of 40 tons on an overhang of 28 feet and itself weighed 180 tons when fully loaded with ballast.

Dates

  • Creation: 1884-03

Creator

Conditions Governing Access

From the Fonds:

Unless restrictions apply, the collection is open for consultation by researchers using the Manuscripts Reading Room at Cambridge University Library. For further details on conditions governing access please contact mss@lib.cam.ac.uk. Information about opening hours and obtaining a Cambridge University Library reader's ticket is available from the Library's website (www.lib.cam.ac.uk).

Language of Materials

English

Finding aid date

2015-09-07 11:52:30+00:00

Includes index.

Repository Details

Part of the Cambridge University Library Repository

Contact:
Cambridge University Library
West Road
Cambridge CB3 9DR United Kingdom