Abridged abstract report of the works on the line of the Rideau Canal showing [amount] of sums expended and amount when completed, 1830
Scope and Contents
A 508 x 356 mm tabular sheet recording the sums expended upon constructing the 25 sections of the canal between 21 Sept. 1826 and 25 Mar. 1830, and a projection of the total cost of completing the project in 1831. It is signed by Lieutenant Colonel John Bly, the engineer who superintended the construction of the canal.
Dates
- Creation: 1830
Creator
- From the Fonds: Frome, Edward Charles, 1802 - 1890 (General) (Person)
Conditions Governing Access
These items are stored in the RCS Plan Chest.
Extent
1 sheet(s) (1 sheet) : paper
Language of Materials
English
Physical Characteristics and Technical Requirements
The top right corner of the sheet, containing part of the 'Remarks' column, has been lost.
Finding aid date
2019-01-15 17:00:54+00:00
Repository Details
Part of the Cambridge University Library Repository
Cambridge University Library
West Road
Cambridge CB3 9DR United Kingdom
Map Dept enquiries: maps@lib.cam.ac.uk
all other enquiries: mss@lib.cam.ac.uk